Banner image
Details for Action 9.2: A transition period is needed to allow existing repositories without certifications to go through the steps needed to achieve trustworthy digital repository status. Concerted support is necessary to assist existing repositories in achieving certification. Repositories may need to adapt their services to enable and facilitate machine processing and to expose their holdings via standardised protocols.

Action 9.2: A transition period is needed to allow existing repositories without certifications to go through the steps needed to achieve trustworthy digital repository status. Concerted support is necessary to assist existing repositories in achieving certification. Repositories may need to adapt their services to enable and facilitate machine processing and to expose their holdings via standardised protocols.

← Back